Method for handling and modernizing ropes in an elevator and arrangement for dismantling ropes of an elevator

US10029889B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10029889-B2
Application numberUS-201615092900-A
CountryUS
Kind codeB2
Filing dateApr 7, 2016
Priority dateApr 30, 2015
Publication dateJul 24, 2018
Grant dateJul 24, 2018

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The invention relates to a method for handling and modernizing ropes in an elevator, which elevator comprises at least an elevator car arranged to run in an elevator shaft along the guide rails, a counterweight connected to the elevator car with hoisting ropes from above, a hoisting machinery with a traction sheave above the elevator car, and compensating ropes connected between the elevator car and the counterweight through a compensating mechanism at a lower part of the elevator shaft. The old hoisting ropes and compensating ropes are dismantled when the elevator car has been run to the upper part of the elevator shaft without a risk of losing the friction on the traction sheave.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for dismantling compensating ropes in an elevator, the compensating ropes having a first end and a second end, the method comprising: first disconnecting the first end of compensating ropes from an original connection with an elevator car; attaching the first end of the compensating ropes to an auxiliary hoist carried by the elevator car; running the elevator car upwards to an upper part of an elevator shaft together with the first end of the compensating ropes; attaching the elevator car to the upper part of the elevator shaft; supporting a counterweight at a lower part of the elevator shaft; second disconnecting the second end of the compensating ropes from the counterweight; and lowering the first end of the compensating ropes using the auxiliary hoist. 2. The method for dismantling compensating ropes in an elevator according to claim 1 , wherein the method further comprises: routing out of the elevator shaft the second end of the compensating ropes; and leading out the compensating ropes from the elevator shaft while lowering the first end of the compensating ropes using the auxiliary hoist. 3. The method for dismantling compensating ropes in an elevator according to claim 1 , further comprising: slackening the compensating ropes before the first disconnecting disconnects the first end of the compensating ropes, the slackening including reducing tension in a compensating mechanism; fastening the first end of the compensating ropes to a roping tool to attach the first end of the compensating ropes to the auxiliary hoist such that the attaching attaches the first end of the compensating ropes to the auxiliary hoist using the roping tool; routing out of the elevator shaft the second end of the compensating ropes after the second disconnecting disconnects the second end of the compensating ropes from the counterweight and before the lowering lowers the first end of the compensating ropes; and leading out the compensating ropes from the elevator shaft, simultaneously with the lowering of the first end of the compensating ropes, wherein the lowering includes lowering the first end of the compensating ropes along with the roping tool. 4. The method for dismantling compensating ropes in an elevator according to claim 3 further comprising: mounting the roping tool on elevator car guide rails below the elevator car, before the running runs the elevator car upwards. 5. The method for removing compensating ropes in an elevator according to claim 3 , wherein the slackening further comprises: slackening the compensating ropes by lifting a deflection sheave arrangement of the compensating mechanism upwards into a higher position and locking the deflection sheave arrangement in the higher position before the first disconnecting disconnects the first end of the compensating ropes. 6. The method for dismantling compensating ropes in an elevator according to claim 3 , further comprising: parking the elevator car in a position in the upper part of the elevator shaft before the lowering lowers the first end of the compensating ropes. 7. The method for dismantling compensating ropes in an elevator according to claim 1 , wherein the running upwards of the elevator car includes using a service run or other slow motion safety run via a control panel of the elevator. 8. The method for dismantling compensating ropes in an elevator according to claim 1 further comprising: installing empty rope reels on a lowermost landing floor outside the elevator shaft, before the lowering lowers the first end of the compensating ropes. 9. A method for modernizing ropes in an elevator, comprising: dismantling the compensating ropes according to claim 1 ; dismantling hoisting ropes, the hoisting ropes having a first end and a second end, the dismantling hoisting ropes including disconnecting the second end of the hoisting ropes from the counterweight, suspending the hoisting ropes from the auxiliary hoist at suspension points, cutting the hoisting ropes at a cut point just above the suspension points to separate the hoisting rope into a first portion from the first end to the cut point and a second portion from a cut end at the cut point to the second end, the second portion of the hoisting ropes being suspended from the auxiliary hoist, the second portion of the hoisting ropes having a cut end and a second end, disconnecting the second end of the second portion of the hoisting ropes from the counterweight, disconnecting the first end of the first portion of the hoisting ropes from fixing points in connection with the elevator car, removing the first portion of the hoisting ropes, and lowering the cut end of the second portion of the hoisting ropes down with the auxiliary hoist; modifying the elevator shaft and a machine room to be suitable for new hoisting ropes and new compensating ropes; and installing the new hoisting ropes and the new compensating ropes. 10. The method for modernizing ropes in an elevator according to claim 9 , wherein the dismantling of the compensating ropes further includes, routing out of the elevator shaft the second end of the compensating ropes before lowering the first end of the compensating ropes using the auxiliary hoist; leading out the compensating ropes from the elevator shaft while lowering the first end of the compensating ropes down using the auxiliary hoist; and the dismantling of the hoisting ropes further includes, routing out of the elevator shaft the second end of the second portion of the hoising ropes, before lowering the cut end of the second portion of the compensating ropes; and leading out the-second portion of the hoisting ropes from the elevator shaft while lowering the cut end of the second portion of the hoisting ropes. 11. The method for modernizing ropes in an elevator according to claim 9 , wherein the dismantling of the compensating ropes further includes, slackening the compensating ropes before the first disconnecting disconnects the first end of the compensating ropes, the slackening including reducing tension in a compensating mechanism, fastening the first end of the compensating ropes to a roping tool such that the attaching attaches the first end of the compensating ropes to the auxiliary hoist using the roping tool, routing out of the elevator shaft the second end of the compensating ropes, before lowering the first end of the compensating ropes, the lowering including lowering, via the auxiliary hoisting, the roping tool together with the first end of the compensating ropes; and leading out the compensating ropes from the elevator shaft simultaneously with lowering the first end of the compensating ropes; and dismantling the hoisting ropes further includes, placing the roping tool in a position at the upper part of the elevator shaft, suspending the roping tool by installing an auxiliary hoist in a machine room, fastening the hoisting ropes into the roping tool, before cutting the hoisting ropes just above the roping tool, routing, out of the elevator shaft, the second end of the second portion of the hoisting ropes, before lowering the cut end of the second portion of the hoisting rope, wherein the lowering includes lowering, via the auxiliary hoist, the roping tool together with the cut end of the second portion of the hoisting ropes, and leading out the hoisting ropes from the elevator shaft, simultaneously with lowering the cut end of the second portion of the hoisting ropes. 12. The method for modernizing ropes in an elevator according to claim 11 , wherein the dismantling of the hoisting ropes further comprises: mounting the roping tool on

Assignees

Inventors

Classifications

  • Other common features of elevators · CPC title

  • B66B19/02Primary

    Installing or exchanging ropes or cables · CPC title

  • Belts · CPC title

  • B66B11/009Primary

    with separate traction and suspension ropes · CPC title

  • Arrangements of ropes or cables · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10029889B2 cover?
The invention relates to a method for handling and modernizing ropes in an elevator, which elevator comprises at least an elevator car arranged to run in an elevator shaft along the guide rails, a counterweight connected to the elevator car with hoisting ropes from above, a hoisting machinery with a traction sheave above the elevator car, and compensating ropes connected between the elevator ca…
Who is the assignee on this patent?
Alasentie Pentti, Reijonen Jarmo, Korvenranta Sakari, and 1 more
What technology area does this patent fall under?
Primary CPC classification B66B19/02. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Jul 24 2018 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).