Defrost operation management in heat pumps

US10018400B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10018400-B2
Application numberUS-201313965543-A
CountryUS
Kind codeB2
Filing dateAug 13, 2013
Priority dateAug 13, 2013
Publication dateJul 10, 2018
Grant dateJul 10, 2018

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

In various implementations, a heat pump may include heating operations and defrost operations. The heat pump may monitor cycle time(s) for one or more of the operations. Defrost operation(s) in the heat pump may be automatically adjusted based at least partially on cycle times.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method comprising: initiating one or more operations of a heat pump, wherein the heat pump includes a heating operation and first and second defrost operations; determining at least one heating operation cycle time associated with at least one heating operation of the heat pump; determining whether to adjust a termination time of the first defrost operation based at least partially on one or more of the determined heating operation cycle times; determining whether to adjust a termination temperature of the second defrost operation based at least partially on one or more of the determined heating operation cycle times; and initiating at least one of the first and second defrost operations; wherein determining whether to adjust the termination time of the first defrost operation is further based at least partially on comparing a change in temperature over time to a predetermined change in temperature. 2. The method of claim 1 further comprising determining whether to adjust a termination temperature of the first defrost operation. 3. The method of claim 1 wherein the termination temperature of the second defrost or operation comprises a default termination temperature; and further comprising: receiving a request for alteration of the termination temperature by a user; and altering the termination temperature based on the received request. 4. The method of claim 1 wherein initiating the at least one of the first and second defrost operations comprises allowing an unaltered defrost operation when a determination is made to not allow an adjustment of the termination time. 5. The method of claim 1 wherein initiating the at least one of the first and second defrost operations comprises allowing an altered defrost operation when a determination is made to allow an adjustment of the termination time. 6. The method of claim 1 wherein determining whether to adjust the termination temperature of the second defrost operation comprises: comparing at least one of the determined heating operation cycle times to a predetermined cycle time; and adjusting the termination temperature based on the comparison. 7. The method of claim 1 wherein determining whether to adjust the termination time of the first defrost operation comprises: comparing at least one of the determined heating operation cycle times to a predetermined cycle time; and adjusting the termination time when at least one of the determined heating operation cycle times is less than the predetermined cycle time. 8. A method comprising: initiating one or more operations of a heat pump, wherein the heat pump includes a heating operation and first and second defrost operations; determining at least one heating operation cycle time associated with at least one heating operation of the heat pump; determining whether to adjust a termination time of the first defrost operation based at least partially on one or more of the determined heating operation cycle times; determining whether to adjust a termination temperature of the second defrost operation based at least partially on one or more of the determined heating operation cycle times; and initiating at least one of the first and second defrost operations; wherein determining whether to adjust the termination temperature of the second defrost operation comprises: comparing at least one of the determined heating operation cycle times to a predetermined cycle time; and adjusting the termination temperature based on the comparison of the at least one of the determined heating cycle times and predetermined cycle time. 9. The method of claim 8 further comprising determining whether to adjust a termination temperature of the first defrost operation. 10. The method of claim 8 wherein the termination temperature of the second defrost operation comprises a default termination temperature, and the method further comprising: receiving a request for alteration of the termination temperature by a user; and altering the termination temperature based on the received request. 11. The method of claim 8 wherein initiating the at least one defrost operation comprises allowing an unaltered defrost operation when a determination is made to not allow an adjustment of the termination time. 12. The method of claim 8 wherein initiating the at least one defrost operation comprises allowing an altered defrost operation when a determination is made to allow an adjustment of the termination time. 13. The method of claim 8 wherein determining whether to adjust the termination time of the first defrost operation comprises: comparing at least one of the determined heating operation cycle times to a predetermined cycle time; and adjusting the termination time when at least one of the determined heating operation cycle times is less than the predetermined cycle time. 14. A method comprising: initiating one or more operations of a heat pump, wherein the heat pump includes a heating operation and first and second defrost operations; determining at least one heating operation cycle time associated with at least one heating operation of the heat pump; determining whether to adjust a termination time of the first defrost operation based at least partially on one or more of the determined heating operation cycle times; determining whether to adjust a termination temperature of the second defrost operation based at least partially on one or more of the determined heating operation cycle times; and initiating at least one of the first and second defrost operation; wherein determining whether to adjust the termination time of the first defrost operation comprises: comparing at least one of the determined heating operation cycle times to a predetermined cycle time; and adjusting the termination time when at least one of the determined heating operation cycle times is less than the predetermined cycle time. 15. The method of claim 14 further comprising determining whether to adjust a termination temperature of the first defrost operation. 16. The method of claim 14 wherein the termination temperature of the second defrost operation comprises a default termination temperature, and the method further comprising: receiving a request for alteration of the termination temperature by a user; and altering the termination temperature based on the received request. 17. The method of claim 14 wherein initiating the at least one defrost operation comprises allowing an unaltered defrost operation when a determination is made to not allow an adjustment of the termination time. 18. The method of claim 14 wherein initiating the at least one defrost operation comprises allowing an altered defrost operation when a determination is made to allow an adjustment of the termination time.

Assignees

Inventors

Classifications

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10018400B2 cover?
In various implementations, a heat pump may include heating operations and defrost operations. The heat pump may monitor cycle time(s) for one or more of the operations. Defrost operation(s) in the heat pump may be automatically adjusted based at least partially on cycle times.
Who is the assignee on this patent?
Lennox Ind Inc
What technology area does this patent fall under?
Primary CPC classification F25D21/004. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Jul 10 2018 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).