Foundation for an offshore wind turbine
US-2025122685-A1 · Apr 17, 2025 · US
US10011968B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10011968-B2 |
| Application number | US-201615054867-A |
| Country | US |
| Kind code | B2 |
| Filing date | Feb 26, 2016 |
| Priority date | Feb 27, 2015 |
| Publication date | Jul 3, 2018 |
| Grant date | Jul 3, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The subject matter of the invention is a gravity structure intended for a marine civil-engineering construction, comprising a slab configured so as to be placed on a sea bed and secured to a shaft directed in a principal direction substantially orthogonal to said slab, characterized in that the gravity structure comprises at least one anchoring tie rod extending in said shaft and in the slab, the gravity structure being configured so that, in a service position of the gravity structure, said at least one anchoring tie rod is anchored in the sea bed.
Opening claim text (preview).
What is claimed: 1. A gravity structure intended for a marine civil-engineering construction, comprising: a slab configured so as to be placed on a sea bed and secured to a shaft directed in a principal direction substantially orthogonal to said slab, wherein the gravity structure comprises at least one anchoring tie rod extending in said shaft and in the slab, the gravity structure being configured so that, in a service position of the gravity structure, said at least one anchoring tie rod is anchored in the sea bed, and wherein the shaft comprises an end opposite to the slab, said at least one anchoring tie rod extending from the end opposite to the slab in the shaft, and at least one tube for guiding said at least one anchoring tie rod and extending from the end opposite to the slab into the slab; and wherein the shaft is hollow and comprises a column forming a top part of the shaft and a base forming a bottom part of the shaft, and each guide tube is disposed in a longitudinal wall of the column and in open air in the base. 2. The gravity structure according to claim 1 , comprising a removable platform. 3. The gravity structure according to claim 1 , comprising a plurality of anchoring tie rods. 4. A method for installing a gravity structure intended for a marine civil-engineering construction, using a slab configured so as to be placed on a sea bed and secured to a shaft directed in a principal direction orthogonal to said slab, the installing method comprising: a step of placing at least one anchoring tie rod so that said at least one tie rod extends in the shaft and in the slab, the gravity structure being configured so that, in a service position, the anchoring tie rod is anchored in the sea bed, the step of placing said at least one anchoring tie rod being preceded by a step of placing at least one tube for guiding said at least one anchoring tie rod extending from an end of the shaft opposite to the slab, as far as the slab; and wherein the shaft is hollow and comprises a column forming a top part of the shaft and a base forming a bottom part of the shaft, and each guide tube is disposed in a longitudinal wall of the column and in open air in the base. 5. The installing method according to claim 4 comprising: a step prior to the steps of placing the tie rod, comprising a step installing the slab on a sea bed, the shaft being erected in a vertical position. 6. The installing method according to claim 4 , comprising a step of filling with water an immersed internal part of the gravity structure. 7. The installing method according to claim 4 , in which the step of placing said at least one anchoring tie rod comprises a step of installing a removable platform at an end of the shaft opposite to the slab. 8. The installing method according to claim 7 , in which the step of placing said at least one anchoring tie rod comprises a step of tensioning said at least one anchoring tie rod performed at a top anchoring. 9. The installing method according to claim 4 , comprising a step of drilling with a drilling tool disposed in said at least one guide tube, during which the drilling tool hollows out a hole in the sea bed, and then the tie rod is introduced into the guide tube and into the drilled hole. 10. The installing method according to claim 7 , in which the step of placing said at least one anchoring tie rod comprises a step of anchoring said at least one anchoring tie rod during which the drilling hole is the subject of an injection of grout.
Placing by screwing down {(screw piles per se E02D5/56)} · CPC title
Reinforced concrete structures (E02B17/021 takes precedence) · CPC title
Platforms with supporting legs · CPC title
using elements penetrating the underwater ground (sinking work pieces E02D15/08, sinking caissons E02D23/02) · CPC title
Gravity structures · CPC title