Arrangements for measuring time integral of electric power or current, e.g. electricity meters

Arrangements for measuring time integral of electric power or current, e.g. electricity meters · Cooperative Patent Classification (CPC)

Computing, optics, measurement, and control technologies.

Related technology areas

Mapped technology topics for this CPC code.

CPC classification statistics
MetricValue
CPC codeG01R22/00
Official titleArrangements for measuring time integral of electric power or current, e.g. electricity meters
Display labelArrangements for measuring time integral of electric power or current, e.g. electricity meters
Total patents87

Filing trend

Year-over-year patent counts classified under this CPC code.

Filing activity over the last five years is declining.

Patents filed per year
YearPatents
201516
20164
201712
20185
201911
20207
20215
202213
20234
20246
20253
20261

Representative patents

Representative publications under this CPC code from precomputed stats, or recent filings when stats are unavailable.

Frequently asked questions

Answers are generated from the same data shown on this page.

What is CPC G01R22/00?
CPC G01R22/00 is the Cooperative Patent Classification code for “Arrangements for measuring time integral of electric power or current, e.g. electricity meters.”
How many patents are filed under CPC G01R22/00 (Arrangements for measuring time integral of electric power or current, e.g. electricity meters)?
Our database includes 87 publications tagged with this CPC code.
Is patent activity under CPC G01R22/00 growing?
Publication counts under this code: 6 in 2024 vs 3 in 2025 (latest complete years).